Planning conditions

The property is not covered by the local spatial development plan. In accordance with Resolution No. XI / 342/19 of the Gdynia City Council of August 28, 2019, the property is located in areas marked with the M1 symbol - areas with a predominance of single-family housing and small residential houses .

Offer description

Building for office and service purposes in a prestigious residential area, just 1 km from the beach.

The property covers a plot of 847 m 2 .

An office building with an area of 307 m 2 is located in the fenced area. A multi-storey building, partly with a basement and favorable exposure from Legionów Street.

Inside the building, there are various office spaces, social, utility and technical rooms. A plot with a regular rectangular shape and a parking lot for approx. 6 cars . Property with access to the power, water and sewage, telecommunications and heating networks.

Near:

  • 150 m - public transport stop
  • 350 m - provincial road No. 468
  • 750 m - railway station Gdynia Wzgórze Św. Maksymilian, the shopping center - Riviera Center
  • 1 km - Gdynia Stadion railway station, Baltic Sea
  • 3 km - Kościuszko Square
  • 7 km - Sopot

Location

Possible use of the property

The investment potential is a very attractive location, among villas and close to the sea. The plot with a parking lot is also an advantage. The property is ideal for conversion into a residential unit combined with an office or service premises.

Sales assumptions

The condition of the sale is the establishment of limited property rights of access to the telecommunications infrastructure remaining within the property, including:

  • area of 117.16 m2 in the building for use as telecommunications equipment – on the ground floor: 85.71 m2 , in the basement: 31.45 m2
    Taking into account additional costs, it is possible to consolidate the equipment, freeing up approximately 15 m2 on the ground floor and 10 m2 in the basement.
  • 27.96 m2 of land on the basis of use for a container with a generator
  • surface area of 8.06 m2 on the facade and 10.06 m2 on the roof, based on the use
  • area of 46.22 m2 in the ground, on the basis of transmission easement

The current electricity connection remains for the needs of OPL's technical equipment. The contractor will make a new power connection on its own.

It is possible to develop a project to optimize the space occupied by the power plant equipment on the ground floor and the battery room in the basement. At the investor's expense, after the sale, the equipment can be moved to other technical rooms after appropriate adaptation.

These materials do not constitute an offer within the meaning of the provisions Of the Civil Code, or any part of such an offer or any other the contract. All information contained in the materials is provided in good faith, however, cannot be considered as representations or assurances as to any circumstances.